Project information
- Client: Toba Tree Building
- Category: Hotels
- Address: Karbala
- Project date: 2022
Design, supply and implementing a central air-conditioning system with a capacity of 510 refrigeration tons for the Tuba Tree Hotel and building in Karbala that include:
- Trane air-cooled chiller.
- Air thrusters.
- Hot/cold water circulation pumps.
- Air duct network.
- Cold/hot water pipe network.
- Air handling units (AHU).