Project information

  • Client: Masjid Al-Kufa
  • Category: Holy
  • Address: Al-Kufa
  • Project date: 2012

20. Design a central air-conditioning system with a capacity of 750 refrigeration ton of for Masjid al-Kufa, which included:

  • Calculating the heat load for the site according to modern software.
  • Preparing design plans for the system.
  • Preparing tables of technical specifications for system equipment.
  • Preparing the BOQ for the system.

Our Partners