Project information
- Client: Masjid Al-Kufa
- Category: Holy
- Address: Al-Kufa
- Project date: 2012
20. Design a central air-conditioning system with a capacity of 750 refrigeration ton of for Masjid al-Kufa, which included:
- Calculating the heat load for the site according to modern software.
- Preparing design plans for the system.
- Preparing tables of technical specifications for system equipment.
- Preparing the BOQ for the system.