Project information
- Client: Al-Askariya Holy Shrine Details
- Category: Holy
- Address: Samarra
- Project date: 2011
Design, supply and implementing a central air conditioning system with a capacity of 300 refrigeration tons for the Al-Askariya Holy Shrine that includes:
- Air Cooled Chiller with a capacity of 150 refrigeration tons (no. 3).
- Hot Water Boiler with a capacity of 150 Kw (no. 3).
- AHUs with a capacity of 75 refrigeration tons (no. 4).
- Air duct network lenght 450 m.