Project information

  • Client: Al-Askariya Holy Shrine Details
  • Category: Holy
  • Address: Samarra
  • Project date: 2011

Design, supply and implementing a central air conditioning system with a capacity of 300 refrigeration tons for the Al-Askariya Holy Shrine that includes:

  • Air Cooled Chiller with a capacity of 150 refrigeration tons (no. 3).
  • Hot Water Boiler with a capacity of 150 Kw (no. 3).
  • AHUs with a capacity of 75 refrigeration tons (no. 4).
  • Air duct network lenght 450 m.

Our Partners